Saturday, November 19, 2011

Madison Bike Lanes 2: Milling

Once the water tables on the side streets were complete, it was time for the milling to begin.

These are the two main vehicles needed to mill a street: the actual milling machine and the dumptruck that hauls all of the removed asphalt.

Of course it's a Roadtec.



Next is the scraper.


I think this is how the Roadtec gets around.

Another scraper.

The manholes are the first thing to get new asphalt to make them flush with the lower surface.

Madison completely milled.

The next step was to mill the side streets that didn't get the water tables.

The sign truck.  

No comments:

Post a Comment